Second layer
-
5.000 m² second layer
5.000 m2 second layer or basin span, consisting of IPE-layers and tunnel tube (heavy duty).
-
12.800 m2 2nd cultivation layer
Complete
-
Walking grids
Walking grids
2.000 meters
5.000 m2 second layer or basin span, consisting of IPE-layers and tunnel tube (heavy duty).
Complete
Walking grids
2.000 meters